KDF TABLE J Cube

Know
(What does the team knows about the assignment?)
Don’t Know
(What doesn’t the team know about issues concerning this assignment?)
Find Out/To Do
(What must the team do or find out in order to complete this assignment?)
Resources
(Where to go to or refer to for required information?)

Air-conditioning system with an efficiency of 0.66 kW/ton.
The location of these key features
Guided tour:-
1) to know about the working principle of the whole system
J-Cube Staff
Estimated energy savings:  8,793,984 kWh/yr; Estimated water savings: 3,419 m
3/yr; ETTV:  38.06 W/m.
The working principle of the monitoring of the chilled –water plant efficiency

Search more information from website
BCA website
http://www.bca.gov.sg/GreenMark/others/gm2011.pdf
Permanent measurement and verification instrumentation for the monitoring of chilled-water plant efficiency.


The equipment they use to monitor A/C system


Green demolition
The purpose of green demolition


Recycling of waste heat and AHU condensates.
What is AHU condensates?


Rainwater harvesting system for landscape irrigation.




Photovoltaic panels on rooftop with system capacity of about 50 kWp to harvest solar energy for production of electricity.



Use of energy efficient lighting, implementation of green lease for tenants and provision of education corners.