KDF TABLE J Cube
Know
(What
does the team knows about the assignment?)
|
Don’t Know
(What
doesn’t the team know about issues concerning this assignment?)
|
Find Out/To Do
(What
must the team do or find out in order to complete this assignment?)
|
Resources
(Where
to go to or refer to for required information?)
|
Air-conditioning system with an
efficiency of 0.66 kW/ton.
|
The location of these key features
|
Guided tour:-
1) to know about the working principle of the whole system
|
J-Cube Staff
|
Estimated energy savings: 8,793,984 kWh/yr; Estimated water savings:
3,419 m
3/yr; ETTV: 38.06 W/m.
|
The working principle of the
monitoring of the chilled –water plant efficiency
|
Search more information from website
|
BCA website
http://www.bca.gov.sg/GreenMark/others/gm2011.pdf |
Permanent measurement and
verification instrumentation for the monitoring of chilled-water plant
efficiency.
|
The equipment they use to monitor A/C system
|
||
Green demolition
|
The purpose of green demolition
|
||
Recycling of waste heat and AHU
condensates.
|
What is AHU condensates?
|
||
Rainwater harvesting system for
landscape irrigation.
|
|||
Photovoltaic panels on rooftop
with system capacity of about 50 kWp to harvest solar energy for production
of electricity.
|
|||
Use of energy efficient lighting,
implementation of green lease for tenants and provision of education corners.
|