Monday 3 December 2012

We went to JCube today to survey the place and plan our video shooting. Some of the green features that we managed to find were: Motion-sensor escalators, garden roofs and recycling bins. Will be posting some pictures soon! Our next meeting will on Thursday.

By the way, JCube have replied the email stating that we can shoot on 17 December. Till then and now, we will start to plan the script and how the video will be. Some of our ideas for the video shooting are: Storyline,  and documentary style. Will update soon.

Bye

Sunday 25 November 2012

We will be having our meeting today. We will be discussing about the presentation on our last visit to MBS. We will also be discussing about our video assignment. Currently, we have received no new reply from JCube. So, we have emailed them again. We also planned for other alternatives if our plan to do the video assignment at JCube fail. Let's hope for the reply.

Next meeting will be on this coming Thursday.

Bye.

Sunday 11 November 2012

Reply of The JCube and Gardens by the Bay

UPDATES

So far, we have received reply from JCube and Gardens by the Bay, stating that they have given us permission to do our video assignment. After some discussion, we have decided to do the assignment at JCube. Currently, we are planning to visit JCube for about three times. The first for us alone to walk around ourselves, the second for us to walk around with a staff, planning our video and the third day would be the viedo shooting day. We are now trying to ask JCube if they can allow us two days for both planning and video shooting. Our first planned visit would probably be on next coming Thursday.

Our next meeting will be this coming Monday. Surely we will discuss more about our plans and we hope to post them here as soon as we can.

Bye.

Thursday 8 November 2012

KDF table of Jcube



KDF TABLE J Cube

Know
(What does the team knows about the assignment?)
Don’t Know
(What doesn’t the team know about issues concerning this assignment?)
Find Out/To Do
(What must the team do or find out in order to complete this assignment?)
Resources
(Where to go to or refer to for required information?)

Air-conditioning system with an efficiency of 0.66 kW/ton.
The location of these key features
Guided tour:-
1) to know about the working principle of the whole system
J-Cube Staff
Estimated energy savings:  8,793,984 kWh/yr; Estimated water savings: 3,419 m
3/yr; ETTV:  38.06 W/m.
The working principle of the monitoring of the chilled –water plant efficiency

Search more information from website
BCA website
http://www.bca.gov.sg/GreenMark/others/gm2011.pdf
Permanent measurement and verification instrumentation for the monitoring of chilled-water plant efficiency.


The equipment they use to monitor A/C system


Green demolition
The purpose of green demolition


Recycling of waste heat and AHU condensates.
What is AHU condensates?


Rainwater harvesting system for landscape irrigation.




Photovoltaic panels on rooftop with system capacity of about 50 kWp to harvest solar energy for production of electricity.



Use of energy efficient lighting, implementation of green lease for tenants and provision of education corners.




Monday 5 November 2012

Video Assignment Planning Sheet




Video Assignment Team Activities
Milestones
Target Week/ Date
No. of hours
a)
Understand the assignment requirement by reading and discussing the requirement
 Week 1 – 2
2 hours
b)
Assign and list specific duties of each team member – to review with your lecturer and post on the Wiki Folder in MeL
 Week 3
2 hours
c)
Brainstorm and agreement on main topic for video assignment
Week 3 – 4
2 hours
d)
First Team Sharing session by:

Week 3 – 4
5 min
e)
Complete the KDF Table
 Week 4 – 5
2 hours
f)
Plan and identify key actions to meet KDF Table findings
 Week 6 – 7
4 hours
g)
Second Team Sharing session by:

 Week 5 – 6
5 min
h)
Visit the chosen area
Week 4 – 6
3 hours
i)
Do final preparation
Week 7 – 8

j)
Do the Final Team Sharing session by:

 Week 7 – 8
5     min
k)
Video shooting and post production
Week 9 – 10
2 week
l)
Complete and post all findings and conclusions in MeL Wiki by:
 Week 11
2 hours
m)
Team Members Reflection by:
Week 12
2 hours

Thursday 1 November 2012

UPDATES

So far, we have 3 meetings with each other, discussing about the location, giving ourselves roles and some research about the possible location.We conduct out meetings on every alternate Mondays and every Thursdays. Regarding the location, we used the BCA website to find out with buildings were certified with the "Green Mark Platinum" so we can focus our search on buildings that practice Energy Efficiency and Conservation (EFCO).
 So far, today, we have enquired these locations based on their special green key features (SGKF):
  • JCube
         Examples of  SGKF: Rainwater harvesting system for landscape irrigation, green demolition
  • Millenia Walk
       Examples of SGKF: Installation of motion sensors to control operation of escalators, roof  top design structures to bring in natural daylight into the main shopping walkways
  • Gardens By The Bay 
  Examples of  SGKF: Specially selected glass with motorized shading system, Biomass co generation system with absorption chiller. Thermal stratification, displacement ventilation and slab cooling. Liquid desiccant system. Provision of photovoltaic panel. Natural water filtration using lake. Earth control measures with turbidity curtain.

            Information taken from: http://www.bca.gov.sg/Publications/others/BCAAwards2011.pdf

We are now currently waiting for their reply. Hopefully we are able to do one of the locations.
We also have planned out how the video should be. 

Our next meeting will be on next Thursday. However, we can still meet up before that if we have the time.